Air Quality Issues Associated with Livestock Production
This chapter reviews the current state of the art on air quality issues associated with animal waste containment. Outdoor waste storage and treatment systems are emphasized. Air quality...

Review of Stabilization of Clays and Expansive Soils in Pavements and Lightly Loaded Structures�History, Practice, and Future
Expansive clay soils�those that change significantly in volume with changes in water content�are the cause of distortions to structures that cost taxpayers several billion dollars annually...

Under Cover
In capping a 190-acre hazardous landfill in metropolitan Los Angeles, engineers saved time and money by relying on a construction method seldom used in the environmental sector: design/build....

The Water Resources Development Act for Restoration of Urban Waterway Superfund Sites
The objective of this paper is to provide information for interested parties to use in their evaluation of WRDA as a potential authority for completion of sediment remediation and restoration...

Transformation
The site of a former wastewater treatment plant in western New York State is now home to a sprawling public works complex thanks to an inventive reuse scheme that consolidates public works...

Stability and Loads
This chapter examines stability and loads. Topics include stability and lateral load resistance during construction; effective lengths of cantilever columns; effect on stability of frame...

Storage, Distribution, and Collection Components
This chapter provides an overview of water and wastewater storage, distribution, and collection components. Checklists are included....

Evaluation of the Geo-Con Vert Wall System
Prepared by the Highway Innovative Technology Evaluation Center (HITEC), a CERF/IIEC Innovation Center This report describes a HITEC evaluation designed...

Evaluation of the Inter-Lok Retaining Wall System
Prepared by the Highway Innovative Technology Evaluation Center (HITEC), a CERF/IIEC Innovation Center. This report describes a HITEC evaluation designed...

Evaluation of the Tricon Retained Soil Wall System
Prepared by the Highway Innovative Technology Evaluation Center, a CERF/IIEC Innovation Center. This report describes a HITEC evaluation designed to...

Evaluation of the Maccaferri Terramesh System Retaining Wall
Prepared by the Highway Innovative Technology Evaluation Center (HITEC), a CERF/IIEC Innovation Center. This report describes a HITEC evaluation designed...

Preserving Pisa's Treasure
Pisa's bell tower, a prime example of Romanesque architecture, would be renowned even if it did not lean. Construction of the tower began in 1173 and was not completed until...

An Arbor for Art
The new $50-million, 153,000 sq ft (14,200 m�) building for the Modern Art Museum of Fort Worth will provide the museum with more than five times its current gallery space. The design...

Improving the Process
By revamping its solids treatment system, the wastewater utility in Louisville, Kentucky, eliminated odors, created a potential source of new revenue, and saved millions of dollars in...

Clean Water at the Crossroads
Thirty years after the passage of the Clean Water Act, the quality of effluent from the nation's wastewater treatment plants has improved considerably. However, much of the...

Environmental Technology Verification Report for the Plasma Enhanced Melter
Prepared by the Environmental Technology Evaluation Center (EvTEC), a service center of CERF/IIEC. This Technology Verification report describes the...

Uses and Limitations of Conventional Hydraulic Models in the Planning and Design of Storage Tunnels
The hydraulic design of storage tunnels requires special considerations relative to the design of conventional sewers. These issues include characterization and control of inflows, energy...

Streambank Stabilization and Revegetation Workshops - IECA
Abstract only, no paper....

Better BMP Practices
A study of the professional literature indicates that the meaning of the term BMP, literally signifying a Best Management Practice, has diverged, depending on the professional field. Use...

Nuclear Shutdown
The lengthy process of decommissioning�and in some cases dismantling�a commercial nuclear power plant is unlike any other project. The few plants that have been decommissioned are providing...

 

 

 

 

Return to search